En
ē¹

YMS Site Visit - Liantang/Heung Yuen Wai Boundary Control Point and associated works - site formation and infrastructure works (Contract No. CV/2013/08)

2019-01-12

09:00 - 13:30

Fanling

Free of Charge

YMS Site Visit - Liantang/Heung Yuen Wai Boundary Control Point and associated works - Site Formation and Infrastructure Works (Contract No. CV/2013/08)

 

To provide an opportunity for students to understand the construction practice on site.

 

Date: 12 Jan 2019 (Saturday)

Time: 09:00 - 13:30 (Lunch is included)

Contract Sum: HK$6,518 million

Contractor: CRBC-CEC-KADEN Joint Venture

 

The project mainly comprises site formation of about 23 hectares of land for provision of Boundary Control Point (BCP) buildings and associated facilities, construction of about 11km long dual 2-lane Connecting Road linking up the BCP with Fanling Highway, design and construction of the Hong Kong Special Administrative Region portion of vehicular bridges and pedestrian bridge crossing Shenzhen River, associated diversion/modification works at existing local roads and junctions, drainage, sewerage, waterworks and landscaping works.

The works include construction of a 4.6 km long dual two-lane trunk road (with about 0.6km at grade roads, 3.3km viaducts and a 0.7km tunnel) connecting Sha Tau Kok Road Interchange to BCP, and the associated environmental mitigation measures, landscaping, drainage/sewerage, waterworks and utilities works.

 

Only 30 vacancies will be provided.